previous / next / 2005 / this project was the first time the same project was researched twice. the original architecture firm, arquitectonica, was replaced with a new firm, gruzen and sampton, and a new design was produced. the college of human ecology asked that the class provide a new set of research materials and recommendations for how this new building could achieve a platinum l.e.e.d. rating. this would be the first platinum building on campus.