<< / >> / wall detail / project architect, gibbs gage architects / calgary / 1991

the main assembly hall of the cultural center required an hvac upgrade. new supply ducts had to be installed from the mechanical room to the center of the space along the walls. a simplified yet correctly proportioned doric order of engaged piers supports an entablature which contains the duct as well as new light fixtures. project responsbilities included design, materials selection, lighting, and production drawings.